Product Detail :
|
Strengthening of clarifier stage-ii civil structures in plant premises. Repairing and modification of bhel stores godowns. Construction of pipe rack at mungani village side boundary wall for ash slurry discharge lines. Work of overhauling, servicing & repairing of air pre heater and its connected system of boiler 2 x 250 mw unit no 3 & 4 during aoh/coh/rsd/fs. Work of preventive and breakdown maintenance of induced draft cooling towers (idct) of unit no. 3 & 4 on as and when required basis. Work of in-situ servicing / overhauling of complete idct fan assembly of unit. no. 3 & 4. Work of routine / shutdown / preventive maintenance, servicing and o/h of wsb, lrsb and aph soot blowers for unit 3 & 4. Supply of aluminium sheet for tps unit 3 & 4.
|