Product Detail :
|
Work contract for establishing free flow at track hopper slit by way of poking/ roding from bottom of hopper near table as & when required basis in chp-b. engineering, manufacture, supply and installation of modular chute (weld overlay) for discharge chute of bc 203 to 114b2 and 114b2 to 1158 in chp-b. supply of liquid chlorine gas for ndct & drinking water system dosing of unit no 8&9 (2x500mw). work contract for comprehensive servicing & repairing of energy efficient air cooling system at hydrogen gas generating plant at wtp-i. annual maintenance contract for works of cable laying & jointing of ht/lt cables at unit 8&9 including ahp & outdoor plant of 2x500mw cstps. annual maintenance contract of fly, coarse & bottom ash evacuation system of unit 5 & 6 & esp internal works of unit 5, 6 & 7 at cstps. work of providing and fixing of astmd 149, astmc794, astmd1002 and astmd790 or equivalent standard compliant material for arresting oil leakage in joint & bolts of ht/lt transformers during aoh of unit-6 and as & when required basis. work of machining of turbine side various auxiliary elements viz tg set bearing oil catchers, fitted keys, valve & stem, bearings, stellite bush, etc as & when required & during aoh of unit-6.
|