Product Detail :
|
Maintenance work of double circuit line. Strengthening work of 220kv main bus A and B. Supply of pg clamp and ct clamp and hpsv lamp and blast. Patrolling and maintenance work of line. Supply of oil surge rile, balkoj rile and pressure relief valve. Installation of 63mva transformer. Maintenance and repair work of emulsifier system and fire hydrant system. Line annual patrolling and maintenance related work. Supply of 220kv dy casted heavy duty pg-clamp and ct, pt and terminal connector and tension fitting. Installation of AC cubical. Construction work of 132kv and 33kv bay. Overhauling work of 132kv circuit breaker. Installation of 3phase ac cubical box. Hindi
|